Loading latest stats...
PHONE

+966 12 6124171

EMAIL

info@lges.com.sa

project

Leaf Global Environmental Services PLC completed an environmental baseline assessment of the marine (subtidal), (coastal intertidal), and terrestrial (supratidal) habitats along the entire length of the Kingdom of Saudi Arabia’s Red Sea Coast. New data regarding the spatial distribution and types of habitats and their associated fauna and flora were collected and collated with existing data; only limited amounts of existing data were identified as being suitable for inclusion in this assessment database.

ARABIAN GULF COASTAL

REMEDIATION AND RESTORATION

RED SEA COASTAL

RESOURCES BASELINE ASSESSMENT

KING ABDULAZIZ

INTERNATIONAL AIRPORT, JEDDAH

KINGDOM CITY

DEVELOPMENT PROJECT

JAZAN ECONOMIC

CITY PORT PROJECT

KING ABDULLAH

ECONOMIC CITY PROJECT

CORAL REEF RESTORATION

SAUDI ARAMCO EPD

NEOM OXAGON

INDUSTRIAL CITY PROJECT

JCD

JEDDAH CENTRAL DEVELOPMENT

ARBAEEN LAGOON

REHABILITATION PROJECT

KING SALMAN PARK

RIYADH MEGA PROJECT

AMAALA TRIPLE BAY

TRIPLE BAY PROJECT

ARABIAN GULF COASTAL
REMEDIATION AND RESTORATION

The Kingdom of Saudi Arabia’s National Center for Environmental Compliance has overseen a large scale remediation and restoration program aimed at mitigating damages that occurred to terrestrial and marine habitats during the 1991 Gulf War. These damages were associated with the massing of coalitional military forces within the kingdom’s northern border province and the release of oil into the Arabian Gulf, which smothered intertidal habitats within its Eastern Province, respectively and, as a result, altered or disrupted tidal flow. In addition, the deposited crude oil formed a physical barrier that prevented the recruitment of infauna by prohibiting the burrowing of organisms into the substrate. We have been involved on this prestigious program over the last 10 years. Leaf Global Environmental Services has worked on several of the program’s coastal remediation projects, which involved the removal of (excavation) and/or homogenization (tilling/ripping) of lingering oil residues and the restoration of salt marsh hydrology. The latter was accomplished by re-establishing tidal channel morphometry through various excavations and recontouring treatments. In addition, Leaf Global Environmental Services has re-established and locally augmented the flora assemblages within salt marsh and tidal flat habitats through the transplantation of perennial halophytes including mangroves.

48,000m

of tidal channels, decomposed

650,00m2

of oil-contaminated tidal flat
substrate & excavated

200,000m2

of asphalt pavements.

RED SEA COASTAL
RESOURCES BASELINE ASSESSMENT

Leaf Global Environmental Services completed an environmental baseline assessment of the marine (subtidal), (coastal intertidal), and terrestrial (supratidal) habitats along the entire length of the Kingdom of Saudi Arabia’s Red Sea Coast. New data regarding the spatial distribution and types of habitats and their associated fauna and flora were collected and collated with existing data; only limited amounts of existing data were identified as being suitable for inclusion in this assessment database. Baseline data made it possible to quantify any injuries associated with short-term events, such as hazardous material spills, vessel groundings, etc. and/ or longer-term impacts associated with developmental pressures. The primary objective of this baseline assessment was to collect new data along KSA’s entire west coast in a coherent manner in an effort to supplement existing data. The new data acquired during this assessment includes

  • Classification of supratidal (within 5 km of the shoreline), intertidal, and subtidal (up to 110 km offshore) habitats.

  • Semi-quantitative survey of the coastal environment (ecosystems, species, humanuse/socio-economic features) by Rapid Environmental Assessment (REA).

  • Classification of the environmental sensitivity of KSA’s Red Sea shoreline; this is based on the behavior of hazardous materials (such as oil) on the various shoreline types located along KSA’s west coast.

5 km

within 5 km of the
shoreline

110 km

subtidal up to 110 km
offshore

KING ABDULAZIZ
INTERNATIONAL AIRPORT, JEDDAH

King Abdulaziz International Airport (KAIA) is located approximately 20 km north of the city of Jeddah. It is the third largest airport in Saudi Arabia. KAIA is the main gateway to the holy cities of Makkah and Madinah. In order to meet increasing numbers of aircraft movements and passengers, the General Authority of Civil Aviation (GACA) of Saudi Arabia commissioned a -3 Phase Master Plan for the construction of a new terminal and development of the airport’s facilities and grounds. Phase I is currently underway and Phase III is scheduled to be completed in 2035. The master plan incorporated the principle of environmental sustainability into the design of the new facility as GACA aimed for the project to achieve Leadership in Energy & Environmental Design (LEED) Silver Status. The construction works and subsequent operation of the airport was implemented in such a manner as to ensure sustainability. The project introduced a new 670,000 m2 passenger terminal equipped with business and first-class lounges and an internal automated people mover linking the passenger processing areas, the gates and a state-of-the-art baggage handling system, airport hotel, and retail facilities. It also introduced a transportation center with an integrated train station that accommodates the new highspeed rail service that connects the cities of Makkah and Madinah through Jeddah and King Abdullah Economic City. Furthermore, an air traffic control tower that is over 130 m high and equipped with the latest air traffic control technology, taxiways, aprons, roads, tunnels, utilities networks, and other support facilities, including a fuel tank farm and hydrant network. Finally, a nursery and garden center to serve the airport and its surrounds.

130m

A new air traffic control tower
that will be over 130m high

670,00m2

A new 670,000 m2 passenger terminal
equipped with business and
first-class lounges

2035

(GACA) Phase III is scheduled
to be completed in 2035

KINGDOM CITY
DEVELOPMENT PROJECT

The Kingdom City Development Project (KCDP) site is located on Saudi Arabia’s Red Sea coast at the entrance of shamal obhur, which is approximately 40 km north of Jeddah’s Central Business District. KCDP is one of the largest and most comprehensive real estate development projects ever to be built in Saudi Arabia. It covers an area of over 7km2 and includes commercial, residential, institutional, educational, entertainment, retail, and hotel facilities. Kingdom City houses 80,000 residents and accommodates 250,000 visitors. The center piece of the development is the landmark Kingdom Tower, which was constructed to a height of over 1,000 m; and is the tallest building in the world. The tower includes fivestar hotel accommodations, commercial office space, and luxury apartments; all with views of the Red Sea to the west and the Sarawat Mountains to the east. Leaf Global Environmental Services completed an EIA for the KCDP site within the -6month period between September 2010 and March 2011.

7km2

It covers an area of over
7km2 and includes
commercial, residential

80,000

expected to house
80,000 residents

JAZAN ECONOMIC
CITY PORT

The Jazan Economic City (JEC) is situated in southwestern Saudi Arabia along its Red Sea coast. In 2009, Leaf Global Environmental Services completed an EIA for the JEC port, which consists of a harbour construction (for handling the movement of construction goods, materials, and equipment) and the main port (for import and export of raw materials and processed cargos to/from the industries within JEC). Offshore/Shoreline works included dredging (channels, berths, basins), land reclamation, the construction of shoreline protection features (break waters, rip rap revetments, sea walls), quays, moorings, a marine pipeline and liquid jetty. Onshore works included buildings, storage facilities, and associated infrastructure (roadways, utilities, etc.). The EIA included an extensive marine survey that established a baseline of water quality and of the diversity and abundance of various marine life, including phytoplankton, zooplankton, seagrasses, macroalgae, benthic invertebrates, fish, corals, and marine mammals. In addition to the marine survey, Leaf Global Environmental Services established a baseline of air quality and background noise levels and performed an ecological survey of terrestrial habitats. Leaf Global Environmental Services also prepared an environmental monitoring and management plan, a turbidity monitoring plan, and a construction and operations environmental management plan for this project.

JAZAN ECONOMIC CITY PORT

KING ABDULLAH
ECONOMIC CITY

King Abdullah Economic City (KAEC) is located on the Red Sea coast roughly 85 km north of Jeddah. This city is one of five economic cities being built in the Kingdom of Saudi Arabia and part of its plan is to attract more foreign investment, increase its international trade, and grow its industrial base. KAEC is designed to support over 125 million m2 of development and contains the following six development districts: sea port, industrial zone, central business district, educational zone, residential zone, and sea resort. Leaf Global Environmental Services prepared and EIA for the KAEC’s sea port district. The seaport is one of the largest cargo and dry bulk ports in the region and is able to receive megaships. The works associated with the port development include: dredging, reclamation, earthworks, and the construction of breakwater, quay structures, berths, and warehousing and bunkering facilities. The EIA included a marine survey of reef flat and fringing reef habitats. During these surveys, detailed notes were taken regarding reef health, the types of biota present, and coral cover. In addition, data concerning the local meteorological conditions, and near shore oceanographic conditions were compiled.

85Km

(KAEC) is located on the
Red Sea coast roughly
85km north of Jeddah

125million

KAEC is designed to
support over 125 million
m2 of development

CORAL REEF RESTORATION
SAUDI ARAMCO EPD PROJECT

This project was in response to a request from Saudi Aramco’s Environmental Protection Department Contracts Unit, Dhahran to undertake constructing, deploying and monitoring 2000 artificial Reef Modules near Abu Ali Island and at another 24 sites within the proximity of Saudi Aramco’s designated coastal areas in the Eastern province of Saudi Arabia. Saudi Aramco’s scope of work for this contract requires construction, deployment and monitoring of 2000 artificial reef modules near Abu Ali Island and at another 24 selected sites, simultaneous pre and postdeployment surveys of selected sites and an evaluation of reef functionality over the duration of two (2) years in the Eastern Province of Saudi Arabia. Leaf Global Environmental Services designed and constructed in house 5 different configurations of concrete modules for under water deployment specifically for this Aramco Project.

2000

Artificial reef modules spread
throughout the Arabian Gulf

24

Sites within the proximity of Saudi Aramco’s
designated coastal areas in
the Eastern province of Saudi Arabia

05

Different configurations
and installation designs

NEOM, OXAGON
INDUSTRIAL CITY PROJECT

Located on the Red Sea coast in northwest Saudi Arabia, Oxagon is a groundbreaking industrial city and a central component of the NEOM giga-project. Designed to transform the industrial sector, it integrates advanced technologies, clean energy solutions, and sustainable urban planning within a carbon-neutral ecosystem. As part of this transformation, the existing Duba Port is being redeveloped into Oxagon Port, positioning it as a major international gateway for containerized and general cargo. Strategically located, the port enhances connectivity to global shipping routes, particularly through the Suez Canal.

The development includes extensive marine infrastructure works, such as dredging, land reclamation, construction of revetments, and new quay walls for container terminals, Ro-Ro operations, and marine services. The access channel and port basin are also being deepened to accommodate larger vessels, thereby increasing overall operational capacity.

LGES is serving as the Environmental Monitoring and Compliance Consultant for the project in collaboration with Boskalis. As part of its scope, LGES is responsible for monitoring key environmental parameters including air quality, noise levels, vibration and light, meteorological data, in-situ water quality, sediment sampling, and conducting monthly reef ecology surveys to ensure the project's environmental sustainability and full regulatory compliance.

CARBON-NEUTRAL

Industrial city with sustainable solutions

GLOBAL GATEWAY

Major international port for cargo

MONTHLY SURVEYS

Reef ecology monitoring

JCD PROJECT
JEDDAH CENTRAL DEVELOPMENT

Located along the Red Sea coast in the heart of Jeddah, the Jeddah Central Development (JCD) is a landmark mixed-use destination being developed under the leadership of the Public Investment Fund (PIF). Inspired by the spirit of Al-Balad, JCD is set to become a global cultural and tourism hub that blends the city's rich heritage with contemporary urban design. The project features vibrant public spaces, waterfront access, and a diverse mix of entertainment, retail, hospitality, and cultural attractions. Strategically situated near Tahlia Street and King Abdulaziz Road, JCD aims to enhance quality of life, attract international investment, and drive sustainable economic growth in alignment with Saudi Arabia's Vision 2030.

The development masterplan incorporates sustainable design principles, smart infrastructure, and comprehensive urban planning that includes roads, pedestrian connectivity, green spaces, and service hubs, establishing JCD as a dynamic and future-ready urban core.

LGES is supporting the project by preparing Environmental Impact Assessment (EIA) studies and conducting baseline environmental assessments including air, noise, and water quality. In addition, LGES is developing the Construction Environmental Management Plan (CEMP) and overseeing compliance and monitoring efforts in accordance with national environmental regulations to ensure the project's alignment with sustainability goals.

VISION 2030

Aligned with Saudi development goals

MIXED-USE

Entertainment, retail, hospitality

SUSTAINABLE

Smart infrastructure and green spaces

JEDDAH, ARBAEEN LAGOON
REHABILITATION PROJECT

Located within the historic district of Al-Balad in Jeddah, the rehabilitation of Al-Arbaeen Lagoon is a key environmental and urban renewal initiative aimed at transforming the lagoon into a vibrant, biodiverse, and culturally rich waterfront destination. The project supports the broader regeneration of Al-Balad, which is led by the Ministry of Culture as part of Saudi Arabia's Vision 2030. This initiative focuses on revitalizing 2.5 km² of historic land while enhancing infrastructure, urban livability, and environmental quality.

The masterplan for Al-Arbaeen Lagoon centers around four primary objectives: improving water quality, developing a high-standard waterfront corniche, enabling water transportation through jetties and moorings, and establishing Al Bunt Marina. These efforts are designed to promote ecological restoration while offering enhanced cultural, recreational, and tourism experiences.

LGES has been appointed as the Environmental Monitoring and Compliance Consultant for the project. Its scope of work includes establishing baseline environmental conditions covering air quality, noise, biodiversity, marine ecosystems, flora, and fauna. LGES is also responsible for preparing the Environmental Impact Assessment (EIA) study and the Construction Environmental Management Plan (CEMP), as well as ensuring ongoing monitoring and regulatory compliance in accordance with the executive guidelines set by the National Center for Environmental Compliance (NCEC).

2.5 km²

Historic land revitalization

4 OBJECTIVES

Water quality, corniche, transportation, marina

VISION 2030

Part of national development plan

KING SALMAN PARK
RIYADH MEGA PROJECT

Located in Riyadh, Saudi Arabia, the King Salman Park project is one of the city's four mega projects, initiated by King Salman bin Abdulaziz Al Saud on May 19th, 2019, in alignment with Saudi Vision 2030. This ambitious initiative aims to elevate Riyadh's global status by positioning it among the top 100 most livable cities worldwide. The park is being developed on the former site of Riyadh's domestic airport, which was later repurposed into a Ministry of Defense facility after the airport was relocated to King Khaled International Airport.

The masterplan for King Salman Park focuses on creating a vast urban green space that enhances environmental sustainability, improves quality of life, and provides recreational and cultural amenities to residents and visitors alike.

LGES has been appointed as the Environmental Monitoring and Compliance Consultant for the project. Its scope of work includes air quality monitoring, noise level monitoring, water quality analysis, meteorological monitoring, and ensuring overall environmental compliance throughout the project lifecycle.

MEGA PROJECT

One of Riyadh's four major developments

VISION 2030

Aligned with national transformation

URBAN GREEN SPACE

Enhancing sustainability and livability

AMAALA
TRIPLE BAY PROJECT

Located in Saudi Arabia, the AMAALA Triple Bay Project comprises three luxury resort destinations. At its core lies the Marina Village Precinct, featuring a Marina Basin with a 2,000-meter marine wall, entrance channel, and flushing channels designed to ensure optimal water quality. The basin will accommodate luxury vessel berthing and serve as a gateway to the broader Triple Bay area.

The masterplan for AMAALA Triple Bay focuses on creating an exclusive waterfront experience that combines luxury hospitality with environmental sustainability, aiming to set new standards in resort development.

LGES has been appointed to supervise the implementation of the Construction Environmental and Social Management Plan (CESMP), monitor environmental compliance on site, conduct regular inspections and environmental monitoring including air, water, noise, soil, and groundwater quality, lead emergency responses, follow up on environmental issues, report to the Project Management Consultant (PMC), and deliver environmental training to construction staff.

3 RESORTS

Luxury destinations in Triple Bay

2,000m

Marine wall for the Marina Basin

SUSTAINABLE

Luxury with environmental standards